Quay and crane information & capacities

The heavy-duty quay facility at the Weser Estuary can be approached from the North Sea without any nautical difficulties or obstacles (e.g. locks or bridges).

The 200 meter long quay facility is available 24/7 to receive goods and materials or to load products. If necessary, the heavy-duty cranes can be supplemented by mobile cranes or floating cranes. Operational procedures (loading/unloading) require coordination with the terminal operator Saar-Rhein Transportgesellschaft mbH and Steelwind.

Further information on Saar-Rhein Transportgesellschaft mbH can be found here.

default
default-2
03-loadout-160613-mps-in-position

Quayside details

Quay length
200 m
Max. Ship length
250 m
Water depth
6 m LAT (NW) – 10m LAT(HW)
Tidal range
4 m
Number of ships
max. 2
Heavy load capacity
100 t/m²
Heavy-duty cranes
2 x 800 t
Crane swing range
45 m (800 t / 1.600 t) | 60 m (500 t / 1.000 t)
Cross beams
2 x 17,5 m – 20 m (800 t each)